Adding a node 14-31
Four- to five-node expansion (shadowed)
Standard 1.0 Modular Option EC Installation and Maintenance Guide November 1999
7 If you are going to have more than 48 ports, do the following:
a. Install a utility card in module MM2, slot 5.
b. Install a third network loop cable from the Meridian 1 switch
to the J4 connector on the backplane of module MM2. See
Chapter 11, “Installing the Meridian Mail to PBX interface,”
for details.
c. Remove the EVB terminator, if there is one, from shroud S7
in module MM2.
8 If you plan to have more than 72 ports, install a fourth network
loop cable from the Meridian 1 switch to the J5 connector on
the backplane of module MM2. See Chapter 11, “Installing the
Meridian Mail to PBX interface,” for details.
Adding node 5 to a shadowed system
Step Action
Module 2
Module 1
Module 0
0
VP/
GP
12345
Util
109
MSU1
MSU3 MSU5
CE
Power
Supply
Node
Y
Node X/Y Node ZMeridian Mail
Module
Node
X
CE
Power
Supply
6
MSU4MSU2
78 11
MMP
40
MMP
40
MMP
40
VP/
GP
0
VP/
GP
12345
Util
109
MSU1
MSU3 MSU5
CE
Power
Supply
Node
Y
Node X/Y Node ZMeridian Mail
Module
Node
X
CE
Power
Supply
6
MSU4MSU2
78 11
MMP
40
MMP
40
MMP
40
VP/
GP
0
VP/
GP
12345
Util
109
MSU1
MSU3 MSU5
CE
Power
Supply
Node
Y
Node X/Y Node ZMeridian Mail
Module
Node
X
CE
Power
Supply
6
MSU4MSU2
78 11
MMP
40
MMP
40
MMP
40
VP/
GP
G100071
Komentáře k této Příručce