14-18 Adding a node
Four- to five-node expansion (unshadowed)
Standard 1.0 Modular Option EC Installation and Maintenance Guide November 1999
7 Perform diagnostics as follows:
a. Check that the main administration terminal is connected to
node 1.
b. Power up module MM0 and observe the node 1 bootup
messages on the terminal and the hexadecimal display on
node 1’s Enhanced MMP40 board.
c. If the terminal output or the hexadecimal display does not
follow the normal bootup sequence described in Chapter 17,
“Troubleshooting operational problems,” then go to that
chapter for troubleshooting procedures.
d. Power off module MM0.
e. If node 1 testing completes successfully, power up all the
modules and observe the hexadecimal display on the
Enhanced MMP40 boards in the remaining nodes.
The hexadecimal displays should increment to at least .6 on
each non-prime node.
f. After the hexadecimal display on each non-prime nodes
Enhanced MMP40 board reaches .6, the testing
successfully completes. Power off all modules and proceed
with the software expansion (step 8).
g. If the hexadecimal display on any Enhanced MMP40 board
does not increment to .6, then power off the module, replace
that board, and try again (return to step e).
8 Refer to the “Comprehensive upgrade” chapter in the
System
Installation and Modification Guide
(NTP 555-7001-215) for
further instructions on how to complete the expansion.
9 Configure the switch for the TNs that correspond to the added
ports. See Chapter 12, “Configuring the Meridian 1,” for details.
Step Action
Zobrazit stránku 247